国产福利永久在线视频无毒不卡,色欧美与xxxxx,一区二区在线 | 欧洲,国产h视频在线观看

NHI Headlines

On April 8th morning, along with a "rumble" roar, NHI "Cooperation 2" Tunnel Boring Machine (TBM for short) started tunneling at the 17m underground construction site of Culture West Road Station of metro line 10. Compared with other TBM, this TBM made by NHI is more humane with reasonable spatial distribution and its cutter parameters are more suitable for Shenyang soil. "Cooperation 2" TBM complete the installation of 20 ring segments within 24 hours.